This hybrid twinset generator we built helped the client reduce their environmental impact for outside broadcasting.

The hybrid generator is a 3 phase capable, 60kva peak system backed up by two Stage V 100kva engines.  The client was able to utilise grid power if it was available and their hybrid truck became a fully backed up UPS system.


Onsite, 318kwh of electricity was consumed which meant they only ran their engines for 7 hours and 20 minutes and an incredible 70L of fuel was used for the entire outside live broadcast.